Bantaba in Cyberspace
Bantaba in Cyberspace
Home | Profile | Register | Active Topics | Active Polls | Members | Private Messages | Search | FAQ | Invite a friend
 All Forums
 Politics Forum
 Environment and sustainable development
 Sambangalou hydropower dam on River Gambia,

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
Videos: Google videoYoutubeFlash movie Metacafe videoQuicktime movieWindows Media videoReal Video
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
toubab1020 Posted - 19 Dec 2020 : 23:05:00
SNIPPET:

"..a reservoir that will extend over 181 km².straddling Senegal and Guinea"

++++++++++
Should be plenty of fish for the locals to catch after a few years,I wonder if there has been any discussion or thought on this there will be years to work out a fair division of fish and other marine species who will have a home there.
++++++++++

https://www.chronicle.gm/andritz-to-supply-hydropower-electro-mechanical-equipment-on-river-gambia/

nternational technology group ANDRITZ will supply the electro-mechanical equipment for the new Sambangalou hydropower dam on River Gambia, downstream the Senegalese region of Kédougou, bordering Guinea. The 100 million euros contract for ANDRITZ is expected to be sealed in the second quarter of 2021.

The Sambangalou hydropower plant will enable the production of renewable energy, irrigation systems for agriculture and supply of drinking water for the neighboring districts. Work will begin in the first half of 2021 and will last 48 months. The overall site will employ up to 1,000 people recruited and trained locally.

In consortium with VINCI, ANDRITZ’s supply includes the complete “from water-to- wire” solution, including three Francis turbines with a total output of 128 MW, generators and all other required equipment. The dam will be 91 meters in height, with a reservoir that will extend over 181 km², straddling Senegal and Guinea. The works, according to the Gambia River Basin Development Organization, will be divided into three phases.

The first phase involves the construction of the project’s access roads, the Kédougou Bridge, and the organization’s housing estate. The second phase is the construction of the dam and a hydroelectric power station. The last phase is the installation of electro-hydro mechanical equipment in the power station to generate a capacity of 128 MW.

Funding for the project

The owner of the hydropower plant is the Gambia River Development Authority, a corporate body formed by the four countries through which the river flows: Senegal, Guinea, Guinea-Bissau and The Gambia.

The multi-purpose dam project is funded by approximately 10 financial institutions including the African Development Bank (ADB), the European Investment Bank (EIB), the Kreditanstalt für Wiederaufbau (KfW), the German development agency, the French Development Agency (AFD), the Islamic Development Bank (IsDB), the Japanese International Cooperation Agency (JICA), the Kuwait Fund for Arab Economic Development (KFAED), the West African Development Bank (BOAD), the World Bank and Exim-Bank of China.

The governments of The Gambia, Guinea, Guinea-Bissau, and Senegal, will also contribute financially to the implementation of the Sambangalou hydropower development project

Bantaba in Cyberspace © 2005-2024 Nijii Go To Top Of Page
This page was generated in 0.03 seconds. User Policy, Privacy & Disclaimer | Powered By: Snitz Forums 2000 Version 3.4.06