toubab1020



12306 Posts

Posted - 19 Dec 2020 :  23:05:00  Show Profile Send toubab1020 a Private Message  Reply with Quote
SNIPPET:

"..a reservoir that will extend over 181 km².straddling Senegal and Guinea"

++++++++++
Should be plenty of fish for the locals to catch after a few years,I wonder if there has been any discussion or thought on this there will be years to work out a fair division of fish and other marine species who will have a home there.
++++++++++

https://www.chronicle.gm/andritz-to-supply-hydropower-electro-mechanical-equipment-on-river-gambia/

nternational technology group ANDRITZ will supply the electro-mechanical equipment for the new Sambangalou hydropower dam on River Gambia, downstream the Senegalese region of Kédougou, bordering Guinea. The 100 million euros contract for ANDRITZ is expected to be sealed in the second quarter of 2021.

The Sambangalou hydropower plant will enable the production of renewable energy, irrigation systems for agriculture and supply of drinking water for the neighboring districts. Work will begin in the first half of 2021 and will last 48 months. The overall site will employ up to 1,000 people recruited and trained locally.

In consortium with VINCI, ANDRITZ’s supply includes the complete “from water-to- wire” solution, including three Francis turbines with a total output of 128 MW, generators and all other required equipment. The dam will be 91 meters in height, with a reservoir that will extend over 181 km², straddling Senegal and Guinea. The works, according to the Gambia River Basin Development Organization, will be divided into three phases.

The first phase involves the construction of the project’s access roads, the Kédougou Bridge, and the organization’s housing estate. The second phase is the construction of the dam and a hydroelectric power station. The last phase is the installation of electro-hydro mechanical equipment in the power station to generate a capacity of 128 MW.

Funding for the project

The owner of the hydropower plant is the Gambia River Development Authority, a corporate body formed by the four countries through which the river flows: Senegal, Guinea, Guinea-Bissau and The Gambia.

The multi-purpose dam project is funded by approximately 10 financial institutions including the African Development Bank (ADB), the European Investment Bank (EIB), the Kreditanstalt für Wiederaufbau (KfW), the German development agency, the French Development Agency (AFD), the Islamic Development Bank (IsDB), the Japanese International Cooperation Agency (JICA), the Kuwait Fund for Arab Economic Development (KFAED), the West African Development Bank (BOAD), the World Bank and Exim-Bank of China.

The governments of The Gambia, Guinea, Guinea-Bissau, and Senegal, will also contribute financially to the implementation of the Sambangalou hydropower development project

"Simple is good" & I strongly dislike politics. You cannot defend the indefensible.
  Previous Topic Topic Next Topic  
 New Topic  Reply to Topic