Bantaba in Cyberspace
Bantaba in Cyberspace
Home | Profile | Register | Active Topics | Active Polls | Members | Private Messages | Search | FAQ | Invite a friend
Username:
Password:
Save Password
Forgot your Password?

 All Forums
 Politics Forum
 Environment and sustainable development
 OMVG Gambia River Development Agency Tender
 New Topic  Reply to Topic
 Printer Friendly
| More
Author Previous Topic Topic Next Topic  

kobo



United Kingdom
7765 Posts

Posted - 04 Jul 2014 :  21:58:21  Show Profile Send kobo a Private Message  Reply with Quote
1. EIB - Gambia River Basin Development Organization (OMVG) - Notice of information meeting (SN-Dakar)




2. Freedom Newspaper Reports Gambia River agency seeks technical assistance for hydro-based energy project

The Gambia River development agency invites expressions of interest from consultants to provide technical assistance for implementation of its hydropower-based energy project. Responses are due August 4.

Organisation pour la Mise en Valeur du Fleuve Gambie (OMVG), which includes Guinea, Senegal, Guinea-Bissau, and Gambia, recruited technical-legal and environmental management consultants last year to advance development of the energy project, which includes the 128-MW Sambangalou hydroelectric project in Senegal on the Gambia River catchment, the 240-MW Kaleta project in Guinea on the Konkoure River, and 1,677 kilometers of transmission lines in Africa's Gambia River Basin.

OMVG courted private sector partners in 2009 to develop the hydro projects and grid interconnection. The energy project is funded by eight international lending organizations.

OMVG now invites expressions of interest for technical and administrative assistance including coordination, planning and execution of project components; monitoring, evaluation and control activities; administrative, financial and accounting work; award of certain contracts; and training and knowledge transfer. The work is expected to require 56 months.

Expressions of interest in French (an original and seven hard copies and seven CD-ROM copies) and an English translation (an original and three hard copies and three CD-ROM copies) are due to the address below by 10 a.m. August 4, labeled "Selection de Consultants pour une Mission d'Assistance Technique a la Maitrise d'Ouvrage a l'OMVG pour la Realisation de Son Projet Energie."

Tenders seen for 93-MW Digan, 82-MW Fello Sounga, 20-MW Saltinho

The OMVG energy project also is to include eventual hiring of consultants for pre-investment studies of a second generation of hydroelectric projects, 93-MW Digan on the Gambia River, 82-MW Fello Sounga on the Tomine River and 20-MW Saltinho on the Koliba-Corubal River. That work is to include feasibility studies, detailed design, preparation of tender documents and social-environmental studies, and technical assistance.

Prospective bidders may obtain further information and express their interest in that work at the address below.

For information, contact Justino Vieira, Secretaire Executif, Organisation pour la Mise en Valeur du Fleuve Gambie (OMVG), Rue Leblanc, Avenue Nelson Mandela, BP 2353, Dakar, Senegal; (221) 338895101; Fax: (221) 338225926; E-mail: omvg@omvg.sn.

SOURCE: http://www.hydroworld.com/articles/2014/07/gambia-river-agency-seeks-technical-assistance-for-hydro-based-energy-project.html

3. Related Bantaba topic New Dam in Senegal ?

4. Afrol News Gambia river basin hydroelectric project to start

Edited by - kobo on 04 Jul 2014 23:06:23

Momodou



Denmark
11634 Posts

Posted - 21 Aug 2014 :  14:11:24  Show Profile Send Momodou a Private Message  Reply with Quote
€827M OMVG energy project to kick off end of 2014

By Lamin B. Darboe

The Daily Observer: Published on Thursday, August 21, 2014


The energy project of The Gambia River Basin Development Organisation (OMVG), valued at 827 million Euros is expected to commence by the end of this year, officials disclosed Tuesday.

OMVG is the executing agency for integrated development programmes in the region and in particular is focused on the rational management of common resources of the Gambia, Kayanga-Géba and Koliba-Corubal Rivers.

The Organisation’s energy project involves the hydro-electric installations of Sambangalou on the River Gambia and Kaleta on the River Konkoure as well as the 1677km of interconnection network linking the four member states.

The project aims at supplying electrical power at low competitive cost, in order to reduce the present capacity production deficit that prevails in the four-member countries.

“The project shall be funded approximately to a tune of 96.16% by the technical and financial partners and 3.84% by OMVG member states rather than a counterpart fund of 105 of total project cost as previously requested by donors,” the OMVG agriculture expert, Kabir Sonko told a validation meeting on the revised environmental and social plan of the OMVG energy project at a local hotel in Kololi.

The response given by technical and financial partners during the coordination meeting held in February 2014 in Conakry, and the pre-assessment meeting held from 14th to 18th July 2014 in Dakar, according to him, had generated great expectations for the implementation within the times allocated for this important energy project.

Sonko said the project will allow these countries to obtain electrical power supplies amounting to 368 MW and a renewable power supply at a minimum cost of 1348 GMh, approximately 10% of their electricity needs by 2018.

He explained that the funds from the member states shall cover essentially all costs related to the Environmental and Social Plan (ESP) through the mobilisation of resources from counterpart fund that shall be subscribed in the respective budgets of the member states from the period 2015-2017.

The Environment, Climate Change, Water resources, Parks and Wildlife minister, Pa Ousman Jarjue, said the OMVG project will have positive impacts on the human habitats such as the improvement of the quality of life in the host sites, the land tenure security and the creation of employment and income opportunities.

The minister however cautioned: “Despite the laudable anticipated socio-economic gains from the construction of Sambangalou Hydroelectric Dam and the interconnection facility from Kaleta Hydroelectric Dam, it is vital for participants to carry out a thorough and vigorous validation process of the revised environment and social plan of the OMVG energy project, bearing in mind non-static evolutions in agriculture, wetland ecosystems, biodiversity and also protected national parks and trans-boundaries waters”.

Minister Jarjue pointed out that the energy project of the OMVG will instigate many environmental and social impacts, both positive and negative. He noted that within the scope of this study, the impacts of the project have been identified and assessed according to the different phases of construction and operation.

With regards to Sambangalou, he observed that the most important impacts on the natural habitats during the construction phase are linked to the loss of natural resources such as soils and the terrestrial vegetation as well as to the faunal habitats, because of the creation of a reservoir of 185km2.

“The government of The Gambia is highly mindful and appreciative of the tireless efforts being made by the OMVG executive secretariat in pursuance of financing avenue for the project and wishes to express it’s profound gratitude to all funding support partners to this project,” he concluded.

The focal point of the OMVG unit in The Gambia, Bai Lamin Sillah and the permanent secretary at the Ministry of Environment, Climate Change, Water Resources, Parks and Wild life, Lamin Jawara all spoke at the occasion.

Source: Daily Observer

A clear conscience fears no accusation - proverb from Sierra Leone
Go to Top of Page

toubab1020



12306 Posts

Posted - 21 Aug 2014 :  19:01:51  Show Profile Send toubab1020 a Private Message  Reply with Quote
If this is the case,very good once the dam is in place it's too late to anything about the problems affecting native species and the living conditions of the people who rely on the river for their survival.GREAT care MUST be taken,MONEY cannot improve everything !!!

The minister however cautioned: “Despite the laudable anticipated socio-economic gains from the construction of Sambangalou Hydroelectric Dam and the interconnection facility from Kaleta Hydroelectric Dam, it is vital for participants to carry out a thorough and vigorous validation process of the revised environment and social plan of the OMVG energy project, bearing in mind non-static evolutions in agriculture, wetland ecosystems, biodiversity and also protected national parks and trans-boundaries waters”.

"Minister Jarjue pointed out that the energy project of the OMVG will instigate many environmental and social impacts, both positive and negative. He noted that within the scope of this study, the impacts of the project have been identified and assessed according to the different phases of construction and operation.

With regards to Sambangalou, he observed that the most important impacts on the natural habitats during the construction phase are linked to the loss of natural resources such as soils and the terrestrial vegetation as well as to the faunal habitats, because of the creation of a reservoir of 185km2."

"Simple is good" & I strongly dislike politics. You cannot defend the indefensible.
Go to Top of Page
  Previous Topic Topic Next Topic  
 New Topic  Reply to Topic
 Printer Friendly
| More
Jump To:
Bantaba in Cyberspace © 2005-2024 Nijii Go To Top Of Page
This page was generated in 0.05 seconds. User Policy, Privacy & Disclaimer | Powered By: Snitz Forums 2000 Version 3.4.06